FA Rohrbach
Home
History
Concrete Contractors
In the News
What's Hot
What's Hot
Contact Us
ProjectsCorporate Video

Projects

Commercial/Industrial | PennDOT | Sitework/Paving | Slipform

Commercial/Industrial

Project Name: Liberty Center
Constructing five story, Class A commercial office building. Contract includes rein.concrete foundation and flatwork, architectural retaining walls and patterned concrete.
Project Type: Work-in-Progress
Year Completed: 2001
Cost: $610,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Bucks Development Corp.

Project Name: Cedar Crest Professional Park #1249
Constructing a four story Class A office building. Contract includes over 900 CY of reinforced concrete foundations and over 50000 SF of 6" composite slab on deck.
Project Type: Work-in-Progress
Year Completed: 2001
Cost: $520,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Cedar Crest Professional Park

Project Name: Primo Produce
Constructed 30,000 SF warehouse and cold storage facility and corporate office. Contract included concrete foundations for pre-engineered building system, insulated concrete flatwork and exterior paving.
Project Type: Commercial/Industrial
Year Completed: 2000
Cost: $275,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Camp Snoopy at Dorney Park
Constructed Dorney Park's new theme attraction. Contract included the construction of nine ride foundations, including a mini-roller coaster with over thirty individual column footings and pedistals, and the construction of over 100,000 SF of midway concrete paving with a hand swirl finish.
Project Type: Commercial/Industrial
Year Completed: 2000
Cost: $540,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Bethlehem Apparatus
Constructed 18,000 SF manufacturing expansion. Contract included concrete footing and flatwork. Slab was installed using a 3-Dimensional Profiler on our Lazer Screed to achieve multiple slopes to the single sump offset from the center of the building. Slopes varied from 6" over 110 feet to 6" over 20 feet.
Project Type: Commercial/Industrial
Year Completed: 2000
Cost: $84,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Boyle Associates

Project Name: Allentown Teacher's Credit Union
Constructed this new branch facility. Contract included full concrete basement, slab on grade/deck and all sitework.
Project Type: Commercial/Industrial
Year Completed: 1999
Cost: $103,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
C.M. Wells Construction, Inc.

Project Name: Turbo Drop/Dorney Park
Constructing the foundation for Dorney Park newest thrill ride--"The Dominator." Foundation consists of 48" thick/300 cubic yard mass concrete mat with over twenty tons of reinforcing bar in thirteen layers. Responsible for the installation of twelve, two ton anchors set to within an elevation tolerance of 1/16".
Project Type: Commercial/Industrial
Year Completed: 1999
Cost: $78,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Outpatient Cancer Center
Constructed a new cancer treatment center in the basement of an existing hospital facility. Contract included selective demolition and excavation to construct rein. concrete gradebeams for linear accelerator. Excavation spoils were removed with a conveyor through a 36" square foundation opening. Strict hand-screed flatwork techniques were required to accomodate equipment installation and welded sheet vinyl flooring.
Project Type: Commercial/Industrial
Year Completed: 1999
Cost: $75,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Kern Construction Company, Inc.

Project Name: Piercing Pagoda
Constructed reinforced concrete structural stud slab on deck and slab on grade for new distribution facility. Included concrete sitework and paving.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $175,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Boyle Associates

Project Name: Weldship
Constructed expansion of existing industrial crane run. Project included extensive gradebeam construction and bonded concrete slab overlay.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $72,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Branch Valley Associates

Project Name: Brey & Krause
Design/Build reinforced concrete dock.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $36,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
F.A. Rohrbach

Project Name: Essroc Rail Scale Pit
Constructed dual rail scale pits and expanded existing truck scale using conventional plywood forming systems.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $34,500.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Gerhart Scale

Project Name: Container Mangement Services
Constructed new sloped slab with 125 LF trench drain in existing manufacturing facility. Responsible for demolition and installation of sanitary sewer.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $121,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: West End Raquet & Fitness Center
Constructed reinforced concrete foundations and flatwork and site improvements for physical therapy unit addition.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $28,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Gavin Construction Management

Project Name: Kentucky Fried Chicken Restaurant
Constructed all concrete items for this fast track new restaurant.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $51,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Bower Construction Management

Project Name: Grandview Estates
Constructed reinforced concrete foundations, flatwork and sitework for elderly housing facility. Slabs achieved flatness/levelness tolerances for prefabricated building frames. Beginning construction on Phase 2 in Fall 1998.
Project Type: Commercial/Industrial
Year Completed: 1998
Cost: $132,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Branch Valley Associates

Project Name: Action Party Rentals
Design/Build reinforced concrete loading dock and paving for new customer service entrance.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $18,400.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Fuller Company, Inc.
Construct research and development facility. Responsible for structural and flatwork concrete including 300 CY reinforced mat foundation and equipment foundations.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $48,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Miller, Miller & McLaughlin Construction

Project Name: Driving Testing Center
Constructed 6000 SF state-leased driving testing center. Responsible for construction of liquid-heat coiled slab on grade over insulated base. Included curb and sidewalk improvements.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $33,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Splendor Industries, Inc.

Project Name: Binney & Smith Manufacturing Facility
Completed all concrete work for new 200,000 SF manufacturing facility including foundations, slabs, equipment foundations and paving. Slabs placed with lazer screed equipment.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $755,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Bowser Construction Company, Inc.

Project Name: Fairways at Brookside
Constructed upscale condominium units responsible for concrete flatwork, curbs and sidewalk. Contract has been renewed for each of fifteen plus years.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $125,000.00
Project Manager:
Woody Rohrbach
Prime/General Contractor:
Bilron Construction

Project Name: Eaton Avenue Elderly Housing Complex
Constructed three-story elderly housing complex. Completed concrete foundation and elevated slab on deck.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $138,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Branch Valley Associates

Project Name: Ungerer & Co., Inc.
Constructed reinforced concrete foundations and flatwork for 32,000 SF manufacturing facility.
Project Type: Commercial/Industrial
Year Completed: 1997
Cost: $131,000.00
Project Manager:
Fred Delong
Prime/General Contractor:
The Norwood Company

Project Name: M.A. Hanna Color
Constructed 61,000 SF manufacturing facility. Responsible for structural, flatwork and paving concrete. Employed gang-form panel system for 18' foundation/retaining wall.
Project Type: Commercial/Industrial
Year Completed: 1996
Cost: $515,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Boyle Associates

Project Name: Transilwrap
Constructed 42,000 sf manufacturing facility. Completed concrete construction of foundations, flatwork and sitework. Redesigned slab for superior crack control and curl resistance.
Project Type: Commercial/Industrial
Year Completed: 1996
Cost: $146,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
The Norwood Company

Project Name: Holiday Inn Express
Completed all concrete items during the construction of this three story hotel. Sitework included the construction of 60,000 gal. detention structure.
Project Type: Commercial/Industrial
Year Completed: 1996
Cost: $155,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Boyle Associates

Project Name: Whitehall Middle School
Completed school addition for all concrete construction. Contract included supply and installation of elevated lathe deck system for second and third floors.
Project Type: Commercial/Industrial
Year Completed: 1996
Cost: $214,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Alvin H. Butz, Inc.

Project Name: Pitt-Ohio Terminal Expansion
Constructed foundations, flatwork and paving for the 12000 sf expansion of a shipping terminal. Slabs included 1.5lb/sf silica hardener application.
Project Type: Commercial/Industrial
Year Completed: 1995
Cost: $125,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Associated Construction Management

Project Name: Neffs National Bank
Construct concrete foundations, slab and sitework for expansion of existing branch bank. Project included full bank vault and precast toppings.
Project Type: Commercial/Industrial
Year Completed: 1995
Cost: $73,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Bank Building Corporation

Project Name: Berenstain Bears Multi-media
Constructed terraced slab for pre-school multi-media amusement park attraction. Project required a great degree of "vision" and planning.
Project Type: Commercial/Industrial
Year Completed: 1995
Cost: $20,700.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Boyle Associates

Project Name: Champion Ground Water Management
Construct foundations and slab for ground water maintenance facility at EPA superfund site.
Project Type: Commercial/Industrial
Year Completed: 1995
Cost: $26,700.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Boyle Associates

Project Name: Lehigh 100, Lot 2&3
Constructed 212,000 SF flex distribution facility. Responsible for structural, flatwork and paving concrete. Designed and supplied concrete under tight quality control requirements. Placed concrete with use of lazer screed.
Project Type: Commercial/Industrial
Year Completed: 1995
Cost: $650,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Ondra-Huyett Associates

Project Name: Food-4-Less Wholesale Grocery
Constructed concrete footings and floor slabs for renovation and expansion for new grocery store. Exposed concrete is the finished for the retail space. Sealer manufacturer, L&M Construction Chemicals, uses the facility as a showcase for their "SealHard" product.
Project Type: Commercial/Industrial
Year Completed: 1994
Cost: $165,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Boyle Associates

Project Name: Ashland Chemical/Nitrogen-Waste Storage
Constructed two containment structures using Type "K" cement concrete.
Project Type: Commercial/Industrial
Year Completed: 1993
Cost: $15,500.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
FAM Construction, Inc.

Project Name: Roma Corporate Center
Constructed six story, 235,000 SF Class A office building. Responsible for structural, flatwork and sitework concrete.
Project Type: Commercial/Industrial
Year Completed: 1993
Cost: $750,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Roma Corporation

Project Name: East Penn Bank
Completed all concrete work for the construction of a two-story branch bank with full basement and plain concrete parking lot.
Project Type: Commercial/Industrial
Year Completed: 1992
Cost: $103,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Bracy Contracting, Inc.

Project Name: Burron Medical, Phase III
Constructed 108,000 sf manufacturing/office expansion. Responsible for flatwork concrete in design/build project. Revised plans and specifications to increase durability and function. Redesign included use of hardeners and sealers and reinforcing not previously specified while reducing cost by almost ten percent.
Project Type: Commercial/Industrial
Year Completed: 1992
Cost: $240,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Boyle Associates

Project Name: Travomatic Corporation
Constructed 90,000 sf manufacturing facility. Responsible for structural and flatwork concrete. Tested slab tolerances using Face system and scored a mean FF 44.5 with a fifty-foot pouring span.
Project Type: Commercial/Industrial
Year Completed: 1991
Cost: $235,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
The Norwood Company

Project Name: BJ's Wholesale Club
Constructed 106,000 sf member wholesale store. Responsible for structural and flatwork concrete under fast track project schedule. Completed contract in less than thirty-five working days.
Project Type: Commercial/Industrial
Year Completed: 1990
Cost: $375,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Buffalo Contracting Group

Project Name: Coca Cola Bottling Company
Constructed 48,000 sf pre-engineered distribution building. Responsible for structural and flatwork concrete. Placed 1lb. of silica hardener pre square foot using mechanical spreader methods.
Project Type: Commercial/Industrial
Year Completed: 1989
Cost: $195,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Nelson Construction Company

Project Name: Parking Garage, Cedar Crest Professional Park
Constructed deck slabs for a four-story parking garage.
Project Type: Commercial/Industrial
Year Completed: 1984
Cost: $204,000.00
Project Manager:
Woody Rohrbach
Prime/General Contractor:
Weiner C.M. Development Group

Project Name: Simons Eastern
Constructed mass concrete footing for fifty-ton compactor unit. Responsible for reinforcing placement and detailed forming patterns.
Project Type: Commercial/Industrial
Year Completed: 1983
Cost: $56,000.00
Project Manager:
Woody Rohrbach
Prime/General Contractor:
F.A. Rohrbach,Inc.