Commercial/Industrial | PennDOT | Sitework/Paving | Slipform
Sitework/Paving
- Project Name: Concrete Streets Program, City of Allentown
- Municipal contract to remove and replace concrete streets throughout the City of Allentown. This is our fourth consecutive year with the contract for this program.
- Project Type: Work-in-Progress
- Year Completed: 2000
- Cost: $210,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Wastewater Treatment Haul Road
- Contract included the removal of existing asphalt paving and reconstructing with a 6" roller compacted concrete (RCC) paving. RCC is a cementitious concrete material which is placed nearly dry and compacted with a static drum roller. The finish product texture of an asphalt binder course with the load capacity of concrete, but at 75% of the cost rein.concrete paving.
- Project Type: Sitework/Paving
- Year Completed: 2000
- Cost: $14,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: LaFarge Haul Road
- Designed and constructed non-reinforced concrete paving to receive an average daily truck traffic of 300 units for this quarry haul road entrance.
- Project Type: Sitework/Paving
- Year Completed: 1999
- Cost: $33,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Scheuermann Excavating, Inc.
- Project Name: Parkland High School
- Complete concrete sitework for new high school complex. Project included 14,000 LF of concrete curb and 72,000 SF of concrete sidewalk including integral coloring.
- Project Type: Sitework/Paving
- Year Completed: 1999
- Cost: $360,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Popple Excavating, Inc.
- Project Name: BEHR Processing Corporation
- Constructed rail siding containment pad. Scope of work included site preparation, excavation, installation of 280 LF of trench drain, and 14" rein. concrete paving with containment curbs.
- Project Type: Sitework/Paving
- Year Completed: 1999
- Cost: $140,000.00
- Project Manager:
- Fred DeLong
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Estates at Trexler Park, Phase 3&4
- Constructed slipformed concrete curb and plain concrete sidewalk for residential subdivision.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $125,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Lehigh Valley Site Contractors
- Project Name: Bridgestone/Firestone
- Completing concrete sitework for this 500,000 sf distribution center. Contract includes slipforming 28" truck curbs and 145,000 sf of concrete paving placed with lazer screed equipment.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $390,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Livengood Excavators
- Project Name: S.Whitehall Township Storm Sewer Contract G
- Constructed rein. concrete spillway for 100 year flood plan.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $58,500.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Anrich, Inc.
- Project Name: Jetway Overlays/Lehigh Valley Int'l Airport
- Designed and installed 5" whitetopping application for repetitive tracking under jetways at new terminal.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $9,500.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Kraft Foods Refrigerated Storage
- Constructed all concrete sitework for 250,000 SF distribution facility including slipformed concrete curb, sidewalk and 65,000 SF 8" reinforced concrete paving.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $225,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Semmel Excavating, Inc.
- Project Name: Sumner Avenue Reconstruction
- Constructed 2500 LF of new concrete curb and sidewalk in seven (7) working days.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $53,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Eastern Industries, Inc.
- Project Name: Mobil Oil Distibution Facility
- Constructed reinforced concrete paving in turn-key operation for terminal facility.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $45,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Thunder Creek Speedway/Dorney Park
- Constructed reinforced concrete paving and retaining walls for recreational racetrack.
- Project Type: Sitework/Paving
- Year Completed: 1998
- Cost: $125,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Estates at Trexler Park, Phase 1&2
- Constructed slipformed concrete curb and plain concrete sidewalk for residential subdivision
- Project Type: Sitework/Paving
- Year Completed: 1997
- Cost: $315,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Scheuermann Excavating, Inc.
- Project Name: Specialty Minerals Courtyard
- Completed courtyard improvements which included decorative and patterned concrete.
- Project Type: Sitework/Paving
- Year Completed: 1997
- Cost: $58,600.00
- Project Manager:
- Stephen Rohrbach
- Prime/General Contractor:
- Northstar Construction Management
- Project Name: Troxell Meadows
- Constructed 14' tapered concrete retaining wall in residential subdivision.
- Project Type: Sitework/Paving
- Year Completed: 1997
- Cost: $72,500.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- CM Development Corp.
- Project Name: City of Allentown Concrete Alley Reconstruction-1997
- Reconstructed twelve city alleys as well as partial depth restoration on public streets. Responsible for demolition, restoration and joint sealant.
- Project Type: Sitework/Paving
- Year Completed: 1997
- Cost: $198,000.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach,Inc.
- Project Name: Essroc Corporate Parking Lot Improvements
- Completely reconstructed exiting corporate parking lot with new concrete parking lot. Responsible for engineering, demolition, and landscaping.
- Project Type: Sitework/Paving
- Year Completed: 1997
- Cost: $250,000.00
- Project Manager:
- Fred DeLong
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Fest Grove Handicap Ramp/Dorney Park
- Constructed ADA compliant handicap ramp for 12' elevation change.
- Project Type: Sitework/Paving
- Year Completed: 1997
- Cost: $65,000.00
- Project Manager:
- Fred DeLong
- Prime/General Contractor:
- Miller, Miller & McLachlin
- Project Name: Emmaus High School/Tennis Courts
- Constructed gang-formed concrete retaining walls with archtectural smooth finish for new school addition.
- Project Type: Sitework/Paving
- Year Completed: 1996
- Cost: $138,000.00
- Project Manager:
- Stephen Rohrbach
- Prime/General Contractor:
- Canjalyn Constructors
- Project Name: ITT Hangar Apron
- Constructed 14" thick concrete apron meeting FAA specifications for new plane terminal expansion.
- Project Type: Sitework/Paving
- Year Completed: 1996
- Cost: $163,000.00
- Project Manager:
- Stephen Rohrbach
- Prime/General Contractor:
- BASCON, Inc.
- Project Name: Keystone Cement Terminal
- Design/Build project for the construction of concrete paving and hazardous waste spill containment project. Responsible for demolition, excavation and paving while plant remained in full production.
- Project Type: Sitework/Paving
- Year Completed: 1996
- Cost: $109,000.00
- Project Manager:
- Stephen Rohrbach
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Bethlehem Housing Authority
- Completed curb, sidewalk and ADA improvements to subsidized housing complex.
- Project Type: Sitework/Paving
- Year Completed: 1995
- Cost: $173,200.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
- Project Name: Pocono Mountain Go-Cart
- Constructed plain concrete paving with smooth finish for go-cart racetrack. This was the second such track we completed for the same owner.
- Project Type: Sitework/Paving
- Year Completed: 1995
- Cost: $77,400.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- M&J Amusements
- Project Name: Aldi Retail Store
- Constructed 350 foot, reinforced concrete storm management channel/energy dissipator.
- Project Type: Sitework/Paving
- Year Completed: 1995
- Cost: $23,400.00
- Project Manager:
- Mark Emswiler
- Prime/General Contractor:
- Lehigh Valley Site Contractors, Inc.
- Project Name: Aldi Foods Distribution Facility
- Constructed over 700,000 square foot concrete parking/distribution lot. Responsible for slipformed curb and concrete paving at a daily rate of 375 to 525 CY in place.
- Project Type: Sitework/Paving
- Year Completed: 1994
- Cost: $895,000.00
- Project Manager:
- Stephen Rohrbach
- Prime/General Contractor:
- Eastern Industries, Inc.
- Project Name: Seager's Union Parents Plaza, Muhlenberg College
- Responsible for concrete sidewalk, paving and retaining wall. Included decorative concrete consisting of colored concrete, scored patterns, and brick pavers.
- Project Type: Sitework/Paving
- Year Completed: 1987
- Cost: $93,000.00
- Project Manager:
- Woody Rohrbach
- Prime/General Contractor:
- F.A. Rohrbach, Inc.
|
|  |