Project Name: Concrete Streets Program, City of Allentown
Municipal contract to remove and replace concrete streets throughout the City of Allentown. This is our fourth consecutive year with the contract for this program.
Project Type: Work-in-Progress
Year Completed: 2000
Cost: $210,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Wastewater Treatment Haul Road
Contract included the removal of existing asphalt paving and reconstructing with a 6" roller compacted concrete (RCC) paving. RCC is a cementitious concrete material which is placed nearly dry and compacted with a static drum roller. The finish product texture of an asphalt binder course with the load capacity of concrete, but at 75% of the cost rein.concrete paving.
Project Type: Sitework/Paving
Year Completed: 2000
Cost: $14,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: LaFarge Haul Road
Designed and constructed non-reinforced concrete paving to receive an average daily truck traffic of 300 units for this quarry haul road entrance.
Project Type: Sitework/Paving
Year Completed: 1999
Cost: $33,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Scheuermann Excavating, Inc.

Project Name: Parkland High School
Complete concrete sitework for new high school complex. Project included 14,000 LF of concrete curb and 72,000 SF of concrete sidewalk including integral coloring.
Project Type: Sitework/Paving
Year Completed: 1999
Cost: $360,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Popple Excavating, Inc.

Project Name: BEHR Processing Corporation
Constructed rail siding containment pad. Scope of work included site preparation, excavation, installation of 280 LF of trench drain, and 14" rein. concrete paving with containment curbs.
Project Type: Sitework/Paving
Year Completed: 1999
Cost: $140,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Estates at Trexler Park, Phase 3&4
Constructed slipformed concrete curb and plain concrete sidewalk for residential subdivision.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $125,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Lehigh Valley Site Contractors

Project Name: Bridgestone/Firestone
Completing concrete sitework for this 500,000 sf distribution center. Contract includes slipforming 28" truck curbs and 145,000 sf of concrete paving placed with lazer screed equipment.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $390,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Livengood Excavators

Project Name: S.Whitehall Township Storm Sewer Contract G
Constructed rein. concrete spillway for 100 year flood plan.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $58,500.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Anrich, Inc.

Project Name: Jetway Overlays/Lehigh Valley Int'l Airport
Designed and installed 5" whitetopping application for repetitive tracking under jetways at new terminal.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $9,500.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Kraft Foods Refrigerated Storage
Constructed all concrete sitework for 250,000 SF distribution facility including slipformed concrete curb, sidewalk and 65,000 SF 8" reinforced concrete paving.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $225,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Semmel Excavating, Inc.

Project Name: Sumner Avenue Reconstruction
Constructed 2500 LF of new concrete curb and sidewalk in seven (7) working days.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $53,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Eastern Industries, Inc.

Project Name: Mobil Oil Distibution Facility
Constructed reinforced concrete paving in turn-key operation for terminal facility.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $45,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Thunder Creek Speedway/Dorney Park
Constructed reinforced concrete paving and retaining walls for recreational racetrack.
Project Type: Sitework/Paving
Year Completed: 1998
Cost: $125,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Estates at Trexler Park, Phase 1&2
Constructed slipformed concrete curb and plain concrete sidewalk for residential subdivision
Project Type: Sitework/Paving
Year Completed: 1997
Cost: $315,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Scheuermann Excavating, Inc.

Project Name: Specialty Minerals Courtyard
Completed courtyard improvements which included decorative and patterned concrete.
Project Type: Sitework/Paving
Year Completed: 1997
Cost: $58,600.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Northstar Construction Management

Project Name: Troxell Meadows
Constructed 14' tapered concrete retaining wall in residential subdivision.
Project Type: Sitework/Paving
Year Completed: 1997
Cost: $72,500.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
CM Development Corp.

Project Name: City of Allentown Concrete Alley Reconstruction-1997
Reconstructed twelve city alleys as well as partial depth restoration on public streets. Responsible for demolition, restoration and joint sealant.
Project Type: Sitework/Paving
Year Completed: 1997
Cost: $198,000.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach,Inc.

Project Name: Essroc Corporate Parking Lot Improvements
Completely reconstructed exiting corporate parking lot with new concrete parking lot. Responsible for engineering, demolition, and landscaping.
Project Type: Sitework/Paving
Year Completed: 1997
Cost: $250,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Fest Grove Handicap Ramp/Dorney Park
Constructed ADA compliant handicap ramp for 12' elevation change.
Project Type: Sitework/Paving
Year Completed: 1997
Cost: $65,000.00
Project Manager:
Fred DeLong
Prime/General Contractor:
Miller, Miller & McLachlin

Project Name: Emmaus High School/Tennis Courts
Constructed gang-formed concrete retaining walls with archtectural smooth finish for new school addition.
Project Type: Sitework/Paving
Year Completed: 1996
Cost: $138,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Canjalyn Constructors

Project Name: ITT Hangar Apron
Constructed 14" thick concrete apron meeting FAA specifications for new plane terminal expansion.
Project Type: Sitework/Paving
Year Completed: 1996
Cost: $163,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
BASCON, Inc.

Project Name: Keystone Cement Terminal
Design/Build project for the construction of concrete paving and hazardous waste spill containment project. Responsible for demolition, excavation and paving while plant remained in full production.
Project Type: Sitework/Paving
Year Completed: 1996
Cost: $109,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Bethlehem Housing Authority
Completed curb, sidewalk and ADA improvements to subsidized housing complex.
Project Type: Sitework/Paving
Year Completed: 1995
Cost: $173,200.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
F.A. Rohrbach, Inc.

Project Name: Pocono Mountain Go-Cart
Constructed plain concrete paving with smooth finish for go-cart racetrack. This was the second such track we completed for the same owner.
Project Type: Sitework/Paving
Year Completed: 1995
Cost: $77,400.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
M&J Amusements

Project Name: Aldi Retail Store
Constructed 350 foot, reinforced concrete storm management channel/energy dissipator.
Project Type: Sitework/Paving
Year Completed: 1995
Cost: $23,400.00
Project Manager:
Mark Emswiler
Prime/General Contractor:
Lehigh Valley Site Contractors, Inc.

Project Name: Aldi Foods Distribution Facility
Constructed over 700,000 square foot concrete parking/distribution lot. Responsible for slipformed curb and concrete paving at a daily rate of 375 to 525 CY in place.
Project Type: Sitework/Paving
Year Completed: 1994
Cost: $895,000.00
Project Manager:
Stephen Rohrbach
Prime/General Contractor:
Eastern Industries, Inc.

Project Name: Seager's Union Parents Plaza, Muhlenberg College
Responsible for concrete sidewalk, paving and retaining wall. Included decorative concrete consisting of colored concrete, scored patterns, and brick pavers.
Project Type: Sitework/Paving
Year Completed: 1987
Cost: $93,000.00
Project Manager:
Woody Rohrbach
Prime/General Contractor:
F.A. Rohrbach, Inc.